CNG Fueling for Turbine Generator Commission Testing

Application: Power Generation

Duration: 5-10 Days

Fuel Type: CNG

Flow Rates: 50-475MCF, 675 PSI delivery pressure, gas temperature at 70 deg

Equipment: 2500mcf of CNG Storage and High Capacity Pressure Reduction Unit

Situation: The local natural gas pipeline could not support the flow and pressure requirements needed to commission their 43MW turbine generators. Thigpen provided a mobile CNG solution to Supply 675 PSI at 70 degrees 475,000SCFH throughout several days of testing.